Industrial Energy Efficiency Copilot
A platform that takes an energy manager from raw electrical measurements to a ranked list of what to inspect first, across several factory sites.
Dashboard and analytics work on simulated data. In a synthetic test (90 records, 3 machines, 30 days) all 3 inserted anomalies were found with no false alarms.
Acquisition unit (ESP32 with a PZEM energy meter over RS485/Modbus) designed and firmware written; hardware not yet validated.
Problem
Many factories see electricity only as a monthly total. Without machine-level data they cannot tell which equipment uses more than expected, which machines run outside production hours, or when efficiency slowly degrades. Companies with several sites cannot easily decide which one to investigate first.
The challenge was set by PT Indmira Global Energi as industry problem owner, and relates to energy-management obligations under Indonesian Government Regulation PP 33/2023.
Approach
One platform covers five steps. Each finding is shown with its evidence, and the platform does not claim savings it cannot verify.
System
Hardware design
The acquisition unit combines an AC inlet and fuse, an HLK-5M05 5 V supply, a PZEM-series energy meter, a MAX485 RS485 interface, an ESP32-WROOM-32D, an OLED display and a microSD module.

Software prototype

My role and the team
I led the team and was responsible for system integration: the dashboard, the data pipeline (MQTT and storage), and coordinating user validation with industry users.
| Member | Role |
|---|---|
| Asem Qaid | Team leader · system integration, dashboard, data pipeline |
| Fawaz Abbaker | Electrical design, metering hardware, ESP32 firmware |
| Abdullah Al-Hamid | Anomaly detection, forecasting, AI assistant |
| Yasmin Mohamed | Market validation, business model, IP preparation |
| Ir. Firdaus, Ph.D. | Academic and technical supervisor |
Results and limits
Shown
- Software met the challenge's Prototype Alpha requirement
- Synthetic test: 3 of 3 inserted anomalies detected, 0 false alarms
- Live MQTT path tested with a simulated meter
Limits and next steps
- No real measurement data yet
- Hardware not assembled or validated
- Interviews with energy managers not yet conducted
- The assistant follows fixed rules; it does not learn
Resources
- PDF Project report · 9 pagesAAQ-P07_Energy-Efficiency-Copilot_Project-Report.pdf Open PDF